Office + Kitchen + Disabled Bathroom

From $150,000 inc GST

Office + Kitchen + Disabled Bathroom Floor Plan Image

Property Details

Area

51m2

Transport Width

4.5m

Enquire about this design

Name(Required)
This field is for validation purposes and should be left unchanged.

Standard Specification

(Custom Commercial)

External

  • Engineered design
  • C2 cyclone rating as standard
  • 2600 high walls (2550 ceiling height)
  • 550mm nominal FFL
  • Insulated walls and under roof
  • HDG steel stumps
  • Glass and aluminium windows/doors with fly screens
  • Solid core flush entry doors (Hume Doors)
  • James Hardie Fine Texture Cladding
  • Colorbond fascia, gutters and roofing
  • James Hardie “Hardie Deck” painted with non slip
  • Aluminium step treads
  • Dulux weather shield or equivalent external paint
  • HWS on welded chassis brackets 125L Everhot with TMV
  • Ramp and landing components separate parts to main module
  • Handrails all HDG with top rail and kick AS1428 compliant
  • Split system AC units on welded chassis brackets x 2

Internal

  • Flush set gyprock ceilings
  • Wet rooms walls in 6mm villaboard
  • 9mm VJ paneling to all other walls
  • Bathroom full tiled floor and walls as “AS1428 complaint Wet Room”
  • Disabled spec fixtures for bathroom from Reece inc back to wall type compliant toilet suite AS1428 compliant
  • Builders range laminate kitchen inc 2 x doors under sink, dishwasher space and 1 bank of 3 draws. Single bowl single drain sink with gooseneck mixer tap
  • Disabled spec fixtures for bathroom from Reece inc back to wall type compliant toilet suite AS1428 compliant
  • White LED downlights, exhaust fans in bathroom, GPO’s throughout, internal sub board in laundry area wall
  • Interior walls in Dulux Wash & Wear premium paint
  • Interior doors & frames in Dulux Aquanamel gloss of wall colour
  • Luminance contract to door frames/arcs as required
  • Accessible spec signage and tactiles
* Please note at contract stage a detailed item and colour selections booklet will be completed which goes through fixtures and finishes in more detail.